Skip to main content
Family-owned. Texas-based. Since 1995.
Crossin Moving & Storage

Moving library · Storage

Moving between homes: plan for a storage gap

Coordinate two move dates, choose accessible belongings, and ask the right questions about storage before your home is ready.

Homeowner planning guide · About 3 minutes to read

01

Plan for two separate handoffs

Write down the date you must leave and the earliest realistic date you can access your next home. A home build or closing can take longer than expected. Crossin owns a storage facility with climate-controlled and standard non-climate-controlled options, so you can discuss storing belongings until the new home is ready.

Ask the team to discuss pickup, the expected storage period, and later delivery as connected parts of the plan. If construction shifts again, contact Crossin to review the storage term and revised delivery; the first pickup does not automatically reserve a later delivery date.

02

Add a construction buffer to the plan

Ask your builder for the current milestone schedule and update your expected possession date when the schedule changes. Treat a target completion date as an estimate until the home is ready for you and the closing or handover is complete.

Plan what will remain with your household during the build and what can go into storage. Keeping daily essentials accessible while the rest is stored can make a temporary stay easier. When the home is ready, coordinate the delivery around confirmed access and the rooms where larger pieces will go.

  • Keep construction and handover contacts separate from your moving contact.
  • Set a reminder to review the storage duration if construction timing changes.
  • Confirm delivery access before scheduling the final trip from storage.

03

Divide belongings into three groups

Group items into what travels with you, what goes into storage, and what must remain accessible during the gap. This is especially useful if you are staying with family or in a short-term rental. Seasonal clothes, school or work items, and paperwork may be needed before you have your new keys.

Make an inventory and label boxes by destination room. Keep a copy outside the storage space so you can identify belongings without opening everything.

04

Choose space around inventory and access

Listed dimensions describe floor area, not guaranteed household capacity. Tall furniture, fragile items, packing choices, and an access aisle all affect fit. Measure the largest pieces and tell the team whether you will need to retrieve belongings during the storage period.

Crossin’s facility offers climate-controlled and standard storage. Ask which option makes sense for your inventory, what conditions each space provides, and how to prepare particular materials. Climate control does not automatically include humidity control.

05

Prepare items to be stored

Pack only clean, dry belongings suitable for the facility. Ask about prohibited items and appliance preparation. Label boxes on visible sides, avoid overloading them, and keep important documents and valuables in your own care.

If you need frequent access, describe that before placement is planned. A box needed next week should not be behind furniture intended to stay for months.

06

Confirm the facility and the later delivery

Crossin owns a storage facility. Ask the Livingston team for its current address, available space, access arrangements, storage terms, and delivery options for your route. The facility is a distinct stop in the plan, so include transportation to storage and the later delivery.

When your new home becomes ready, update the team with the delivery address, access details, and desired timing. Recheck the destination inventory and identify anything you want handled differently after the storage period.

Use this as a planning starting point. Confirm the services, timing, preparation, and terms for your specific move directly with the team.

Good to know

Questions about moving between homes: plan for a storage gap

A clearer picture before you pack the first box.

What should I confirm before belongings go into Crossin’s storage facility?

Confirm the facility address, climate-controlled or standard option, available space, access arrangements, item preparation, storage term, charges, and the later delivery. Keep the agreed details with your move paperwork.

How do I plan for items I need before delivery?

Keep a separate list of daily essentials and anything needed during the gap. Avoid placing medicines, important documents, work equipment, or first-night supplies into storage if you will need them.

Can storage help when a newly built home is delayed?

Yes. Crossin owns a storage facility that can hold belongings between move-out and a later move-in. Share the construction schedule, likely duration, and anything you need to keep accessible; confirm available space and delivery timing with the team.

Your next chapter starts here

Moving dates not lining up?

Share your pickup, storage, and delivery timing so the team can discuss the steps and available options.

Call the teamFree Estimate